Every figure sent from this company is prepared by an engineer and reviewed before it is released. Nothing on this site generates a price automatically. That is deliberate: an automated number cannot account for the fit dimensions of the vessel, the availability of the alloy, or the inspection scope the client's specification requires, and a wrong number costs more time than a slow one.
What can be done immediately is the engineering: the internal type, the size, the expected pressure drop and the assumptions behind them. Those are given as a selection note at enquiry stage, so the technical basis is settled before commercial terms are discussed.
| Data item | Why it changes the result |
|---|---|
| Service, tag and fluid | Decides the internal family: vane pack, mesh pad, coalescer media or fiberbed element |
| Gas flow at operating conditions | Sets the face area through the allowable velocity; density matters as much as volume |
| Liquid flow and liquid load | Decides drainage capacity and whether the element can operate without re-entrainment |
| Operating pressure and temperature | Changes gas density, allowable velocity, and the material that can be used |
| Required outlet: droplet size in microns, or concentration in mg per Nm3 | Decides the technology class; 30 microns and 1 micron are not the same product |
| Allowable pressure drop | Limits media density and bed thickness, and therefore the achievable outlet |
| Vessel inside diameter and height available | Sets the fit geometry and the number of sections the element has to be split into |
| Nozzle and manway sizes, inlet orientation | Decides whether the element can be installed and removed, and how the flow is distributed |
| Material and applicable specification | Alloy, sour service, PMI, food or pharma contact all change both cost and lead time |
| Quantity, destination and required date | Freight, packing, and whether the schedule requires expediting |
A price based on flow rate alone is a guess with a drawing attached, and it is not issued here. If the process data is incomplete, the reply states exactly which items are missing and what each of them changes, rather than filling the gaps with defaults. The two items most often missing are the liquid load at upset conditions and the required outlet droplet size, and both of them decide the product rather than the price of the product.
| Situation | What comes back | Typical time |
|---|---|---|
| Complete process data and vessel dimensions supplied | Selection note with technical basis, followed by a formal quotation | Two working days for the selection note; quotation once the technical basis is accepted |
| Partial data | A list of the missing items and what each one changes | Same or next working day |
| Replacement of an existing element, drawing available | Form, fit and function comparison with the existing part | Two to three working days |
| Replacement with no drawing or dimensions | Measurement guide, or a proposal for a site measurement | Same working day on the guide |
Process data is used for the selection and the quotation, and is not circulated beyond the people working on the enquiry. A confidentiality agreement is signed on request before data is exchanged, and it is normal for the agreement to be in place before the process sheet is sent.
Four things move a quotation, and all of them are visible in advance: a change in material grade driven by the chemistry, an inspection scope that turns out to be wider than assumed (third-party witness, extra PMI, radiographic examination), a quantity change that alters the fabrication set-up, and a delivery term that requires expediting or air freight. Where none of these change, the first quotation stands.
For the full data set that removes a round of questions, see the technical data sheet requirements. For what happens after the order is placed, see the service scope, fabrication and inspection, and urgent replacement delivery.